Claxton and Demory — missing data register
Purpose: List what cannot be known confidently from current processed files in this vault for SITE_HOME (Claxton, Anderson County) and SITE_FARM (Demory, Campbell County), and what must be gathered next. This is a gap register, not a substitute for deeds, surveys, or county offices.
Epistemic stance: County-level NASS tables and one Campbell Web Soil Survey session (Demory site intelligence) improve context; they do not replace parcel truth. Uncertainty is explicit until evidence is filed.
Anchors: East Tennessee two-site farm business plan (package) · Local evidence package — East Tennessee two-site · Parcel evidence intake and validation workflow · Field verification program — Phase 0–1 (Claxton and Demory) · Claxton home base — site intelligence · Demory farm — site intelligence · Validation and pilot plan — first 24 months · Validation backlog and decision gates.
Legend — site: C = Claxton / Anderson · D = Demory / Campbell · Both = both sites.
1. Parcel-specific land intelligence still missing
| Gap |
Site |
Why it matters |
Resolve by |
Blocks / informs |
| Legal boundary + acreage tied to operating map |
Both |
CAPEX, taxes, insurance, and V8 use/structures depend on deed vs mental map |
Deed, plat, survey if disputed; single operating polygon in GIS/sketch |
V8; fence/water eligibility; G1 |
| WSS AOI clipped to ~5 ac / ~120 ac operating footprints |
C (homestead AOI none in corpus) |
Map units for homestead garden/buildings unknown |
Draw WSS AOI on Claxton footprint; export report |
V1; homestead build siting |
| WSS AOI aligned to management acres (not 558.6 ac session blob) |
D |
Vault capture is 558.6 ac ≠ ~120 ac plan label—soil % by field wrong until clipped |
Redraw AOI to deed or operating boundary; re-run Soil Map |
V1, V4; spatial model MAP_AUTHORITY |
| Easements / ingress / shared lane |
Both |
Batching and emergency access assumptions |
Title search; neighbor letters; drive log |
Trip policy; R13 security; V8 |
2. Buildability / septic / utilities data still missing
| Gap |
Site |
Why it matters |
Resolve by |
Blocks / informs |
| OSSS / septic class + setbacks |
C (primary residence/shop) |
Homestead expand (shop, ADU) and health |
County environmental health; perc/morph if required |
Phase 0–1 homestead CAPEX; capital plan sequencing |
| Septic / SSDS for ag structures (if any) |
D |
Employee facilities, cooler, wash—if on path |
Same + TDEC / county rules (septic captures) |
V8 structures path; Phase 2+ |
| Electric service size, transformer, single- vs three-phase |
Both |
Pump, cold, broker, homelab loads |
Utility will-serve / meter data |
Capital plan; smart-tech broker placement (smart-tech strategy) |
| ISP / fiber / LTE at address and at field pins |
C primary; D for telemetry |
Telemetry and office work truth |
ISP maps; V10 drive tests at tanks/gates |
V10; G8 path; instrumentation priority |
| Domestic vs ag power accounting (if split meters) |
Both |
Books and margin truth |
Utility account structure |
Revenue model; Schedule F hygiene (not tax advice) |
3. Soil / slope / hydrology questions still unresolved
| Gap |
Site |
Why it matters |
Resolve by |
Blocks / informs |
| Map unit + limiting factors on each field polygon |
D (partial WSS); C unknown |
Rotation, lime, wet no-go |
Clip WSS; walk with map; optional soil test grid |
V1, V4; enterprise strategy row-crop vs grazing |
| Hydric / ponding / seasonally wet areas |
D |
Fence, lanes, winter traffic |
Field observation + wet year photos |
V2 water routing; R14 erosion |
| Riparian / stream buffers / TDEC |
D (streams in WSS imagery) |
Crossings, waste stacking, civil liability |
TDEC / county field visit |
V2; risk register R10/R14 |
| Karst / sink / cave risk |
Both (ET variable) |
Structure and waste siting |
Local cave maps; walk |
V8; buildability |
4. Access / road / drainage / erosion unknowns
| Gap |
Site |
Why it matters |
Resolve by |
Blocks / informs |
| Private road maintenance + liability |
Both |
Who plows, who pays grading |
Easement docs; neighbor agreement |
OPEX; trip reliability (Q2 two-site ops) |
| Grade, crown, culverts, rolling dips on primary haul route |
D (steep AOI); C driveway |
Mud/ice → batching failure |
Bad-weather drive log; photos |
Validation access row; R14 |
| Internal farm lanes — base, width, sediment |
D |
Hay, stock, equipment cost |
Engineer sketch or NRCS; rain event notes |
Capital plan earthwork line; G1 |
| Gate locations + winter icing |
D |
Labor and animal welfare |
Tagged walk; V3 segments |
Trip policy; labor surge |
5. Market / rent / county-economic unknowns
| Gap |
Site |
Why it matters |
Resolve by |
Blocks / informs |
| Your pasture/hay/lease rate vs NASS 2024 county cropland row |
D |
NASS is survey estimate, not pasture lease; Anderson $28.50 vs Campbell $27.50 is ballpark only |
Signed comps; broker conversations; auction notes |
V7; fallback thesis (recommended enterprise strategy) |
| Processing slots + haul shrink to your chosen outlets |
D |
V6 all-in per head |
Processor calls; mileage log |
V6; G1 margin |
| Property tax + ag classification outcomes |
Both |
Cash plan |
County assessor; DOR ag rules (ag exemption context) |
Revenue milestones; entity choice (professional) |
6. Infrastructure reconnaissance still required
| Gap |
Site |
Why it matters |
Resolve by |
Blocks / informs |
| Well reports / pump tests / seasonal flow |
D |
V2 herd ceiling |
Pump test; log drawdown |
V2, V4; water CAPEX |
| Fence segment condition by length |
D |
V3 repair tiers |
Tagged photos + rough feet |
V3; fence order |
| Handling MVP (corral, load-out) as-built |
D |
V6 marketing / welfare |
Walk + measure |
Phase 2 timing |
| Cold chain / power at processing adjacent loads |
D |
Shrink and regulatory risk |
Trial haul; thermometer log |
Revenue model processing row |
7. What can be learned from desktop sources
| Source type |
What it can answer (still approximate) |
Cannot replace |
| Web Soil Survey (new AOI per site) |
Map units, slopes, broad limitation classes on drawn polygon |
Perc, wet spots under trees, illegal fill history |
| FEMA NFHL / local flood layers |
Zone hints for insurance and build setbacks |
Field flood behavior in convective events |
| USGS / 3DEP |
Drainage context, slope distribution |
Pipe sizes, legal drainage rights |
| NASS Quick Stats / county rent PDFs |
County economic ballpark |
Your lease; pasture specifics when NASS -- |
| FSA / NRCS public pages |
Program eligibility surface |
Signed contracts, EQIP approval |
8. What requires on-site inspection, survey, or county-office interaction
| Class |
Examples |
Typical owner |
| County office |
Zoning V8, septic permits, assessor classification |
Environmental health, planning, property assessor |
| Licensed survey / PE |
Boundary disputes, structural pads on steep ground |
Surveyor, geotech when warranted |
| Field inspection |
Fence walk, wet year lanes, tank levels, predator pressure |
Family + optional consult |
| Utility truck roll |
Transformer location, line extension quotes |
Power co-op / utility |
| Professional services |
Title, entity, tax elections |
Attorney, CPA |
9. Field verification program (how gaps get closed)
Use Field verification program — Phase 0–1 (Claxton and Demory) as the operator checklist that maps each gap class above to site, method, evidence artifact, and validation gate (tasks V1–V12, gates G1–G3, and risk register rows). When a visit produces primary evidence, close or narrow the matching row here and append log.md per parcel evidence intake workflow.
| Gap section (above) |
Primary verification § (program) |
| §1 Parcel / land |
§1 Site walks; §2 Access; WSS Both prep |
| §2 Buildability / septic / utilities |
§4 Utilities; §8 Buildability/permits |
| §3 Soil / hydrology |
§1 + §3 Drainage; V1 soil follow-up |
| §4 Access / road / drainage |
§2 + §3 |
| §6 Infrastructure recon |
§1 Fence; §5 Power |
| §7 Market / rent |
Mostly desktop + contracts—not a substitute for §§1–4 |
This register should shrink as evidence lands in raw/processed/ + source-notes; log significant closes in log.md under lint or ingest.