East Tennessee two-site farm business plan — integration revision audit (2026-04)

Scope: One hardening-and-integration pass over the existing canonical package (East Tennessee two-site farm business plan (package)) and its chapter pages—no parallel business plan, no TOC replacement.

Ledger role: Summarize what doctrine and evidence packages now change in the plan, which pages were touched, what strengthened vs what stayed weak or blocked, and new sequencing / risk implications.


What materially changed in the plan

Theme Effect on the business plan
Local evidence & parcel intelligence County/desktop anchors (NASS rent bands, WSS-derived terrain bias for Campbell AOI, Claxton OSSS/utility posture) are treated as directional inputs to enterprise fit, capital sequencing, and labor surge honesty—not as parcel deed facts. G1-class decisions still require field verification, worksheets, and the missing-data register; the plan explicitly routes Phase 0–1 execution through Field verification program — Phase 0–1 (Claxton and Demory).
Off-grid & connectivity doctrine SITE_FARM planning default (solar + battery, mesh / LPWAN before WAN convenience, WAN-optional local survivability) is bound into capital sequencing, smart-tech Starlink framing, and risk: Starlink remains backhaul, not a substitute for local gateway + power domain truth or DR-1-style load metering (Off-grid systems doctrine package — Demory, Local-first / WAN-optional — Demory, Connectivity strategy — Claxton & Demory).
Sensor & field telemetry doctrine Phase 0–1 observe-first scope is tied to farm sensor architecture, field-node roles, gateway/controller patterns, duty-cycle / power assumptions, sensor degraded modes, and the sensor checklist matrix—so pilot design, labor triage, and observability load are not “sensor count” optimism (Farm sensor architecture — Demory farm site, Sensor checklist matrix — Demory farm).
Platform, backup/DR, observability Where the control-center stack follows Pi + k3s patterns, the plan now routes explicit backup/restore obligations, DR drill posture, and remote trust bar (secrets, alerting philosophy, minimum conditions before privileged remote work) instead of implying “homelab = free HA” (Platform doctrine package, Kubernetes platform backup/DR — Pi k3s Longhorn, Backup / DR doctrine hub, Observability, secrets, and trust bar — homelab / farm edge).
Source authority & navigation Chapters cross-check against evidence grade and evidence-hardening work so exploratory prose does not masquerade as parcel truth; authoritative clusters remain operator indexes, not substitutes for local measurement (Evidence grade and canonical authority, Evidence hardening audit — East Tennessee (2026-04)).

Pages updated (this pass)

Path Change summary
../business-plan/east-tennessee-two-site-farm-business-plan.md “What changed” block + updated date; points here.
east-tennessee-two-site-farm-business-plan-framework.md Known fact K10, unknown U10, assumption A5, vault spine links (platform DR, observability trust bar, field verification, this audit).
east-tennessee-two-site-farm-business-plan-vision-and-constraints.md Evidence / doctrine alignment note for Phase 1 gates vs desk evidence.
east-tennessee-two-site-farm-business-plan-two-site-operating-context.md WAN-optional / connectivity routing on the 35-minute model.
east-tennessee-two-site-farm-business-plan-enterprise-options-analysis.md Automation-fit scoring tied to sensor doctrine artifacts.
east-tennessee-two-site-farm-business-plan-recommended-enterprise-strategy.md Pointer to this audit as integration spine.
east-tennessee-two-site-farm-business-plan-labor-and-family-model.md Field verification as labor/time evidence path.
east-tennessee-two-site-farm-business-plan-smart-tech-strategy.md Doctrine binding bullets (sensors, degraded modes, platform, backup/DR, trust bar).
east-tennessee-two-site-farm-business-plan-capital-and-financing.md Platform/backup/observability obligations when edge/k3s scope is real.
east-tennessee-two-site-farm-business-plan-revenue-and-phased-income.md Haul / processing / parcel evidence caveat.
east-tennessee-two-site-farm-business-plan-risk-register.md R16 — WAN + off-grid stress converging on telemetry trust.
east-tennessee-two-site-farm-business-plan-10-year-roadmap.md Phase 0–1 rows reference field verification program.
east-tennessee-two-site-farm-business-plan-validation-backlog.md Integration audit + structured field program routing.
east-tennessee-two-site-farm-business-plan-remediation-backlog.md Top pointer: hostile review plus integration ledger.
east-tennessee-two-site-farm-business-plan-executive-summary.md One-paragraph integration pointer.
execution-dossier-hub-phase-0-1-east-tennessee.md Purpose block: integration audit link.
execution-dossier-decision-memo-phase-0-1-east-tennessee.md Governance cross-link to audit + trust bar.
../topics/business-plan-execution-and-pilot-operations-hub.md Canonical table row for this audit.
../topics/two-site-smart-farm-operations.md Business-plan table row for audit.
../index.md Index line for discoverability.
../log.md refactor entry for this pass.

Assumptions strengthened

  • Two-site + batching thesis for grazing-led work on a rough Campbell-class production context (WSS AOI summary in site intelligence)—still not a substitute for field fence/water/stock movement proof.
  • Homestead-as-control-center for broker, backups, and patch cadence—conditional on verified power + ISP truth at SITE_HOME (Claxton intelligence + capital page sequencing).
  • Starlink / LTE as WAN, not field RF—consistent across connectivity dependency maps and smart-tech strategy.
  • Telemetry ROI skepticism reinforced with explicit sensor power/degraded-mode and triage routing (checklist matrix + stop rules).

Assumptions still weak, blocked, or parcel-gapped

  • Exact ~120 ac operating boundary, internal lanes, septic/soil per field, live pump/well tests, and haul/processor math remain open until field worksheets + register rows close (Claxton and Demory — missing data register, Parcel evidence intake workflow).
  • Debt capacity, household cash need (HH_NEED), and effective family FTE remain family evidence, not wiki-filled numbers.
  • Longhorn / central storage HA choices stay scope-gated by platform decision memo and pilot maturity—business plan states pilot-ready vs overbuilt without prescribing SKUs.

New or elevated risks / sequencing implications

  • R16 (new): Concurrent WAN brownout + battery/autonomy stress can invalidate “remote triage saves trips” unless local-first state, manual SoT, and trust-bar remote rules hold.
  • Earlier explicit earthwork / lane / drainage peers with fence/water on SITE_FARM when terrain evidence is adverse (already partially in capital/risk—now echoed in framework unknowns).
  • Field verification is a first-class Phase 0–1 deliverable channel—not optional “nice photos.”


Status

Closed for 2026-04 integration pass: ledger captured; further doctrine changes should edit chapters + append a dated subsection here or spawn a new dated audit only if the delta is large enough to warrant a second ledger (avoid parallel strategy essays per AGENTS.md canonicalization rule).

Follow-on: Execution gates — Phase 0–1 (East Tennessee two-site) (EG gate tables) — operational pilot vs production pass/fail system derived from this narrowing (2026-04-28).