East Tennessee two-site farm business plan — integration revision audit (2026-04)¶
Scope: One hardening-and-integration pass over the existing canonical package (East Tennessee two-site farm business plan (package)) and its chapter pages—no parallel business plan, no TOC replacement.
Ledger role: Summarize what doctrine and evidence packages now change in the plan, which pages were touched, what strengthened vs what stayed weak or blocked, and new sequencing / risk implications.
What materially changed in the plan¶
| Theme | Effect on the business plan |
|---|---|
| Local evidence & parcel intelligence | County/desktop anchors (NASS rent bands, WSS-derived terrain bias for Campbell AOI, Claxton OSSS/utility posture) are treated as directional inputs to enterprise fit, capital sequencing, and labor surge honesty—not as parcel deed facts. G1-class decisions still require field verification, worksheets, and the missing-data register; the plan explicitly routes Phase 0–1 execution through Field verification program — Phase 0–1 (Claxton and Demory). |
| Off-grid & connectivity doctrine | SITE_FARM planning default (solar + battery, mesh / LPWAN before WAN convenience, WAN-optional local survivability) is bound into capital sequencing, smart-tech Starlink framing, and risk: Starlink remains backhaul, not a substitute for local gateway + power domain truth or DR-1-style load metering (Off-grid systems doctrine package — Demory, Local-first / WAN-optional — Demory, Connectivity strategy — Claxton & Demory). |
| Sensor & field telemetry doctrine | Phase 0–1 observe-first scope is tied to farm sensor architecture, field-node roles, gateway/controller patterns, duty-cycle / power assumptions, sensor degraded modes, and the sensor checklist matrix—so pilot design, labor triage, and observability load are not “sensor count” optimism (Farm sensor architecture — Demory farm site, Sensor checklist matrix — Demory farm). |
| Platform, backup/DR, observability | Where the control-center stack follows Pi + k3s patterns, the plan now routes explicit backup/restore obligations, DR drill posture, and remote trust bar (secrets, alerting philosophy, minimum conditions before privileged remote work) instead of implying “homelab = free HA” (Platform doctrine package, Kubernetes platform backup/DR — Pi k3s Longhorn, Backup / DR doctrine hub, Observability, secrets, and trust bar — homelab / farm edge). |
| Source authority & navigation | Chapters cross-check against evidence grade and evidence-hardening work so exploratory prose does not masquerade as parcel truth; authoritative clusters remain operator indexes, not substitutes for local measurement (Evidence grade and canonical authority, Evidence hardening audit — East Tennessee (2026-04)). |
Pages updated (this pass)¶
Assumptions strengthened¶
- Two-site + batching thesis for grazing-led work on a rough Campbell-class production context (WSS AOI summary in site intelligence)—still not a substitute for field fence/water/stock movement proof.
- Homestead-as-control-center for broker, backups, and patch cadence—conditional on verified power + ISP truth at
SITE_HOME(Claxton intelligence + capital page sequencing). - Starlink / LTE as WAN, not field RF—consistent across connectivity dependency maps and smart-tech strategy.
- Telemetry ROI skepticism reinforced with explicit sensor power/degraded-mode and triage routing (checklist matrix + stop rules).
Assumptions still weak, blocked, or parcel-gapped¶
- Exact ~120 ac operating boundary, internal lanes, septic/soil per field, live pump/well tests, and haul/processor math remain open until field worksheets + register rows close (
Claxton and Demory — missing data register,Parcel evidence intake workflow). - Debt capacity, household cash need (
HH_NEED), and effective family FTE remain family evidence, not wiki-filled numbers. - Longhorn / central storage HA choices stay scope-gated by platform decision memo and pilot maturity—business plan states pilot-ready vs overbuilt without prescribing SKUs.
New or elevated risks / sequencing implications¶
- R16 (new): Concurrent WAN brownout + battery/autonomy stress can invalidate “remote triage saves trips” unless local-first state, manual SoT, and trust-bar remote rules hold.
- Earlier explicit earthwork / lane / drainage peers with fence/water on
SITE_FARMwhen terrain evidence is adverse (already partially in capital/risk—now echoed in framework unknowns). - Field verification is a first-class Phase 0–1 deliverable channel—not optional “nice photos.”
Related canonical artifacts (unchanged scope; routing targets)¶
Local evidence package — East Tennessee two-siteProcedural guides package strategyOperational standards — farm and homelab platform
Status¶
Closed for 2026-04 integration pass: ledger captured; further doctrine changes should edit chapters + append a dated subsection here or spawn a new dated audit only if the delta is large enough to warrant a second ledger (avoid parallel strategy essays per AGENTS.md canonicalization rule).
Follow-on: Execution gates — Phase 0–1 (East Tennessee two-site) (EG gate tables) — operational pilot vs production pass/fail system derived from this narrowing (2026-04-28).