Power domains and battery-backed infrastructure tiers — Demory farm site¶
Purpose: Tie electrical domains to which infrastructure must remain battery-backed and which can be duty-cycled — so network design ( gateways , radios ) lands on the same buses as pumps and controls . No invented wattages ; use placeholders until metered .
Doctrine package: Off-grid systems doctrine package — Demory. Power doctrine: Off-grid power doctrine — Demory farm site. Topology: Off-grid farm execution topology — Demory (Mermaid).
Naming (aligned with validation text)¶
| Symbol | Meaning |
|---|---|
| Pcrit | Loads and controls that must stay up through normal cloud / WAN outages and short SOC dips (policy + engineering )** |
| Popt | Optimistic / sheddable loads : extra RF , non-critical cameras , optional CPE , shop toys |
Placeholder : P_NET_ALWAYS_W = ___ W (clamp meter ) ;** tie to Loads register.
Domains (conceptual)¶
```mermaid flowchart LR subgraph dc["DC domain — PV / battery native"] pv["PV strings"] bat["Battery pack"] dc_loads["DC loads — some controls, radios (policy)"] end
subgraph ac["AC domain — inverter"] pump["Pump / heavy AC"] inv_misc["Barn AC outlets"] end
pv --> bat bat --> dc_loads bat --> ac ```
Decision: Minimize inverter hours for pure DC where safe and code-compliant — cite AHJ / NEC with a PE for final design .
Battery-backed tiers¶
| Tier | What belongs | Network tie-in | Always-on vs duty-cycled |
|---|---|---|---|
| T0 — Life/safety policy | Interlocks that must not depend on cloud | Local logic / wiring first ; IP optional | Always-on power path (small Wh if done right )** |
| T1 — Gateway spine | One field gateway / MQTT aggregation | Backs mesh → LAN ; buffers when WAN down | Always-on by default ; measure Wh before adding second spine |
| T2 — Mesh / sub-GHz infra | Repeaters, HaLow APs | Each hop is a load on its node (solar + local battery )** | Often duty-cycled (DR-1 )** |
| T3 — WAN CPE | Starlink / LTE | Egress only ; not in Pcrit unless explicitly chosen | Sheddable during deep SOC |
Pilot vs scale¶
| Phase | Tier focus |
|---|---|
| 0–1 | Prove T0 + T1 on one DC / AC segment ; meter before T2 fleet (DR-5) |
| Later | Redundant PV / genset policy only after G1 / water / fence per business plan |