East Tennessee two-site farm business plan (package)

First-class entry for the decision-grade business plan: ~5-acre home base and ~120-acre production in East Tennessee, ~35-minute separation, family labor, phased enterprises, telemetry as capital, 10-year horizon. Detailed rubric, knowns/unknowns, and full tables live in the planning framework; this page is the stable navigation spine for readers and agents.

What changed — integration pass (2026-04)

This revision does not replace the package or reading order. It binds newer canonical doctrine and county/site intelligence into chapter pages so the narrative matches execution reality: local evidence + missing-data discipline, off-grid/WAN-optional sequencing, sensor architecture + checklist matrix, platform/backup/DR + observability trust bar, procedural standards routing, and clearer confidence boundaries (desk evidence vs parcel truth). Durable ledger: Business plan integration revision audit (2026-04).

Operational bar: The package is not “live” until Ready for execution passes—see Hostile internal review §7.

Canonical detail hub: East Tennessee two-site farm business plan — planning framework

Topic operations hub (telemetry, runbooks, comparisons): Two-site smart farm operations

Execution & pilots router (Phase 0–1 dossier, validation—without replacing this TOC): Business plan execution and pilot operations hub

Phase timeline (visual): East Tennessee two-site farm business plan — phase timeline

Modeled sites & systems (entities) — planning roles, not your deed: Five-acre home base (SITE_HOME), 120-acre production farm (SITE_FARM), Field telemetry network — two-site. Business shell (TN + federal compliance, not legal advice): Tennessee farm business compliance package · entity pattern router Farm business legal entity model. Page ownership (avoid analysis sprawl): Structural audit — page ownership, entity gaps, and hub routing.

Authority & execution evidence (regulatory / agency / extension — not parcel-specific facts): Authoritative execution evidence cluster — East Tennessee. Gap audit (what is still missing for execution-grade clarity): Execution readiness gap audit — East Tennessee operational knowledge. Evidence hardening audit (2026-04 desk portals + routing; open gaps): Tennessee two-site — evidence hardening audit (2026-04). Vocabulary (canonical vs supporting vs exploratory): Evidence grade and canonical authority. Operator contract (ingest activation, Evidence summaries, structural vs integration validation): AGENTS.md.

Site intelligence (named anchors): Router (county vs place vs validation vs gaps): Local site and county intelligence. Analyses: Claxton home base — Anderson County (SITE_HOME), Demory farm — Campbell County (SITE_FARM), Anderson vs Campbell — operating implications. Parcel worksheets (structured fields; evidence-backed only): Parcel intelligence package — East Tennessee two-site. Local field evidence (measured vs reported; execution tables): Local evidence package — East Tennessee two-site — site/infrastructure/utility/loads baselines, field observation templates, parcel evidence workflow. Folded into canonical chapters (2026-04-22): two-site operating model, recommended enterprise strategy, capital plan, revenue model, risk register, validation/pilot plan, execution dossier (90d/12m/24m), spatial model, labor model, smart-tech strategy—no duplicate package pages.


Reading order (core narrative)

Order Page
0 Planning framework
* Executive summary — optional first read for the one-page map
1 Vision, objectives, and constraints
2 Two-site operating context — 35-min distance tax; links distance-tax detail + trip policy
2b Two-site operations model — 5 ac / 120 ac — DT-* rules, R_SPLIT; read before picking daily-touch enterprises
2c Trip batching and site visit policy, Two-site structure disqualifiers
3 Enterprise options analysis
4 Recommended enterprise strategy
5 Labor model and weekly operating rhythm
6 Smart technology and telemetry strategy — AA/AF/PA/SO
6b Automation stop rules — NS/MV/CS (incl. CS-5, MV-8 for off-grid farm), Phase 1 observe-only
6c Off-grid operational decision rules — Demory + Capital plan (Off-grid Demory sequencing) — after smart-tech + stop rules; before major field RF/WAN spend
7 Capital plan and infrastructure sequencing
8 Revenue model and milestones
9 Risk register and mitigation strategy
10 10-year roadmap (Phases 0–4)
11 Validation backlog and decision gates

Execution, pilots, and first 24 months

Integration ledger (2026-04): Business plan integration revision audit — material plan deltas vs doctrine/evidence packages.

Start here (Phase 0–1 dossier): Execution dossier hub — read order: Decision memo → Execution gates — Phase 0–1 (EG gate tables; pilot vs production) → First 90 days → First 90 days — operator packet (weeks 1–12 runbook) → Master checklist → First 12 months → First 24 months.


Operational artifacts (fillable matrices)

Linked from the framework; same targets as Two-site smart farm operations Operations & logistics / Resilience tables.


Financial planning layer (methodology; evidence fills placeholders)


Business shell — entity, tax, insurance, labor (Tennessee + federal)

Router: Tennessee farm business compliance package — LLC path, EIN/responsible party, TNTAP + ag exemption research, greenbelt per county, insurance checklist (UT W1266), DOL/TN DOL labor routing, BOI/FinCEN status note, compliance calendar.


Critique, remediation, and source campaign


Wiki / repository wiring (merge order, not farm economics)