Infrastructure inventory baseline — both sites¶
Scope: Physical infrastructure shared or comparable across SITE_HOME (Claxton) and SITE_FARM (Demory): fencing, lanes, water movement, gates, fixed crossings—not utility accounts (see Utility and service baseline).
Package: Local evidence package — East Tennessee two-site.
Entities: Farm water infrastructure system · Farm on-site power system (generation/distribution, not loads table).
Epistemic classes¶
| Class | Use |
|---|---|
| Measured | Length, diameter, pressure test, photo with date |
| Reported | Installer, prior owner, well log |
| Assumption | Engineering default—label and revisit |
| Unknown | Not yet inspected |
Master matrix (repeat rows per segment)¶
| Site | Asset ID | Category | Fact class | Description / route | Material / age if known | Condition | Last verified | Blocks until known |
|---|---|---|---|---|---|---|---|---|
| SITE_HOME | H-F-001 | Perimeter fence | Unknown | TBD | Unknown | Unknown | — | Animal plan, liability |
| SITE_HOME | H-G-001 | Gate | Unknown | TBD | Unknown | Unknown | — | Trailer access |
| SITE_FARM | F-F-001 | Perimeter fence | Unknown | TBD | Unknown | Unknown | — | Stocking boundaries |
| SITE_FARM | F-L-001 | Internal lane | Unknown | TBD | Unknown | Unknown | — | Winter feed route |
Categories: perimeter fence · cross fence · lane · gate · culvert · water line (buried) · riser · trough · pond dam / spillway · power run (pole to barn) — add rows; do not fill with guesses.
Water movement (inventory layer)¶
| Site | Segment | Fact class | From → to | Pipe/size if known | Head / pressure notes | Blocks |
|---|---|---|---|---|---|---|
| SITE_HOME | — | Unknown | TBD | Unknown | Unknown | Garden irrigation, frost |
| SITE_FARM | — | Unknown | Well → distribution TBD | Unknown | Unknown | Grazing layout, pump sizing |
Deep dive: well logs, pump curves → cite raw/ + water entity.
Power distribution (not end-use loads)¶
| Site | Segment | Fact class | Description | Panel / disconnect location | Blocks |
|---|---|---|---|---|---|
| SITE_HOME | — | Unknown | Service → subpanels TBD | Unknown | Backup interlock, transfer switch |
| SITE_FARM | — | Unknown | Service → pump / barn TBD | Unknown | Solar tie-in point |
End-use loads: Loads register.
Evidence, excavation, and water-development references (national / state)¶
Use for design discipline and checklist prompts—not a substitute for site engineering, TDEC / local floodplain admin, or 811 locates on your routes.
| Topic | Vault grounding |
|---|---|
| Excavation / utility locate (TN) | TN 811 captures: Inbox batch — Frigate, SOPS, Prometheus, TN811, NRCS/UT (2026-04-18) (tenn811-*-capture-inbox-2026-04-18.md). |
| Fencing | UT Extension PB1541 PDF + extract in same batch. |
| Livestock watering alternatives | UT Extension PB1641 PDF + extract in same batch. |
| NRCS watering practice (CPS 614) + irrigation guide | CPS 614 hub page + NEH Part 652 PDF + extract in same batch. |
| Flood hazard desk screening | Tennessee two-site — official parcel, GIS, flood, and climate portals (FEMA MSC link). |
Field validation (add rows to the master matrix as measured): white-lining dig lines per 811 guidance; pressure/flow at troughs; evidence of unmarked utilities → second notice per 811 process.
Decision gates¶
| Decision | Blocked until |
|---|---|
| Fence repair vs replace budget | Segment-level condition + priority animals |
| Water system upgrade (pipe, storage) | Measured flow/pressure at representative points + winter demand |
| Solar / generator siting | Shade study + infrastructure path to load centers |