Infrastructure inventory baseline — both sites

Scope: Physical infrastructure shared or comparable across SITE_HOME (Claxton) and SITE_FARM (Demory): fencing, lanes, water movement, gates, fixed crossings—not utility accounts (see Utility and service baseline).

Package: Local evidence package — East Tennessee two-site.

Entities: Farm water infrastructure system · Farm on-site power system (generation/distribution, not loads table).


Epistemic classes

Class Use
Measured Length, diameter, pressure test, photo with date
Reported Installer, prior owner, well log
Assumption Engineering default—label and revisit
Unknown Not yet inspected

Master matrix (repeat rows per segment)

Site Asset ID Category Fact class Description / route Material / age if known Condition Last verified Blocks until known
SITE_HOME H-F-001 Perimeter fence Unknown TBD Unknown Unknown — Animal plan, liability
SITE_HOME H-G-001 Gate Unknown TBD Unknown Unknown — Trailer access
SITE_FARM F-F-001 Perimeter fence Unknown TBD Unknown Unknown — Stocking boundaries
SITE_FARM F-L-001 Internal lane Unknown TBD Unknown Unknown — Winter feed route

Categories: perimeter fence · cross fence · lane · gate · culvert · water line (buried) · riser · trough · pond dam / spillway · power run (pole to barn) — add rows; do not fill with guesses.


Water movement (inventory layer)

Site Segment Fact class From → to Pipe/size if known Head / pressure notes Blocks
SITE_HOME — Unknown TBD Unknown Unknown Garden irrigation, frost
SITE_FARM — Unknown Well → distribution TBD Unknown Unknown Grazing layout, pump sizing

Deep dive: well logs, pump curves → cite raw/ + water entity.


Power distribution (not end-use loads)

Site Segment Fact class Description Panel / disconnect location Blocks
SITE_HOME — Unknown Service → subpanels TBD Unknown Backup interlock, transfer switch
SITE_FARM — Unknown Service → pump / barn TBD Unknown Solar tie-in point

End-use loads: Loads register.


Evidence, excavation, and water-development references (national / state)

Use for design discipline and checklist prompts—not a substitute for site engineering, TDEC / local floodplain admin, or 811 locates on your routes.

Topic Vault grounding
Excavation / utility locate (TN) TN 811 captures: Inbox batch — Frigate, SOPS, Prometheus, TN811, NRCS/UT (2026-04-18) (tenn811-*-capture-inbox-2026-04-18.md).
Fencing UT Extension PB1541 PDF + extract in same batch.
Livestock watering alternatives UT Extension PB1641 PDF + extract in same batch.
NRCS watering practice (CPS 614) + irrigation guide CPS 614 hub page + NEH Part 652 PDF + extract in same batch.
Flood hazard desk screening Tennessee two-site — official parcel, GIS, flood, and climate portals (FEMA MSC link).

Field validation (add rows to the master matrix as measured): white-lining dig lines per 811 guidance; pressure/flow at troughs; evidence of unmarked utilities → second notice per 811 process.


Decision gates

Decision Blocked until
Fence repair vs replace budget Segment-level condition + priority animals
Water system upgrade (pipe, storage) Measured flow/pressure at representative points + winter demand
Solar / generator siting Shade study + infrastructure path to load centers

Site baselines