Master checklist — Phase 0–1 execution (East Tennessee two-site)

Purpose

Single priority-ordered list covering land intelligence, infrastructure recon, first business experiments, first telemetry experiments, and labor/workflow tests. Reduces hopping between pages; detailed copy-paste rows remain on Pilot and recon checklists.

Week-by-week operator view (T0+90d): First 90 days — operator packet (East Tennessee two-site) — weeks 1–12 priorities and checkpoints alongside this checklist.

Boundaries: Decision memo.


How to use

  1. Work top to bottom in each band; skip rows not applicable with written reason.
  2. Initial and date completion in your tracker (spreadsheet / notebook).
  3. Map P# items to L/I/B/T/W IDs on the pilot checklists for evidence pointers.

Band P0 — Start (T0 → T0+30d)

P# Stream Action IDs
P0.1 Labor / governance Numeric stop rules visible; hour log started (V11, W1) V11, W1
P0.2 Land intelligence Canonical map authority named (L1); NRCS soils pulled (L2) L1, L2, V1
P0.3 Legal V8 zoning / use path started V8
P0.4 Fence Fence walk begun (L5, V3) L5, V3
P0.5 Water All water points on map (I1); V2 started I1, V2

Band P1 — T0+30d → T0+90d

P# Stream Action IDs
P1.1 Land Wet/steep walk + photos (L3); sensitive areas (L6) L3, L6
P1.2 Infra Pump/panel labels two people (I3); bad-weather access drive I3, I5
P1.3 Business Sale bills collection toward 12 weeks (B1, V5) B1, V5
P1.4 Business Processor call log (B2, V6) B2, V6
P1.5 Business Haul cost range (B3) B3
P1.6 Telemetry 30d manual water log (T1, G8) T1, G8
P1.7 Telemetry Cell screenshots tanks/gates (T2, V10) T2, V10
P1.8 Labor Two-site trip purpose log (W4) W4

Band P2 — T0+90d → T0+12mo

P# Stream Action IDs
P2.1 Land Paddock segments numbered (L4); fence repair tiers L4, V3
P2.2 Infra Flow/recovery notes (I2); dry stress note (I4) I2, I4
P2.3 Business V5 complete; B5 kill/pivot rule if needed V5, B5
P2.4 Business V7 lease comps if lease path V7, B4
P2.5 Insurance V9 quotes + gaps closed or accepted V9
P2.6 Telemetry One pilot sensor if G8 done (T3); T4 trip before/after T3, T4
P2.7 Telemetry T5 triage hours; T6 kill if worse than manual T5, T6
P2.8 Labor 8-week log complete; W2 surge window; W3 rhythm rev W1–W3
P2.9 Labor W5 coverage gap → hire/neighbor row ? W5

Band P3 — T0+12mo → T0+24mo (G1 path)

P# Stream Action IDs
P3.1 Capacity V4 conservative ceiling locked for planning V4
P3.2 Gates G1 evidence packet assembled (V1–V4 + legal use ) G1
P3.3 Processing V6 credible for chosen animal class V6
P3.4 Finance V12 debt limits if used V12
P3.5 Infra Gate IDs match registry (I6) I6