Master checklist — Phase 0–1 execution (East Tennessee two-site)
Purpose
Single priority-ordered list covering land intelligence, infrastructure recon, first business experiments, first telemetry experiments, and labor/workflow tests. Reduces hopping between pages; detailed copy-paste rows remain on Pilot and recon checklists.
Week-by-week operator view (T0+90d): First 90 days — operator packet (East Tennessee two-site) — weeks 1–12 priorities and checkpoints alongside this checklist.
Boundaries: Decision memo.
How to use
- Work top to bottom in each band; skip rows not applicable with written reason.
- Initial and date completion in your tracker (spreadsheet / notebook).
- Map P# items to L/I/B/T/W IDs on the pilot checklists for evidence pointers.
Band P0 — Start (T0 → T0+30d)
| P# |
Stream |
Action |
IDs |
| P0.1 |
Labor / governance |
Numeric stop rules visible; hour log started (V11, W1) |
V11, W1 |
| P0.2 |
Land intelligence |
Canonical map authority named (L1); NRCS soils pulled (L2) |
L1, L2, V1 |
| P0.3 |
Legal |
V8 zoning / use path started |
V8 |
| P0.4 |
Fence |
Fence walk begun (L5, V3) |
L5, V3 |
| P0.5 |
Water |
All water points on map (I1); V2 started |
I1, V2 |
Band P1 — T0+30d → T0+90d
| P# |
Stream |
Action |
IDs |
| P1.1 |
Land |
Wet/steep walk + photos (L3); sensitive areas (L6) |
L3, L6 |
| P1.2 |
Infra |
Pump/panel labels two people (I3); bad-weather access drive |
I3, I5 |
| P1.3 |
Business |
Sale bills collection toward 12 weeks (B1, V5) |
B1, V5 |
| P1.4 |
Business |
Processor call log (B2, V6) |
B2, V6 |
| P1.5 |
Business |
Haul cost range (B3) |
B3 |
| P1.6 |
Telemetry |
30d manual water log (T1, G8) |
T1, G8 |
| P1.7 |
Telemetry |
Cell screenshots tanks/gates (T2, V10) |
T2, V10 |
| P1.8 |
Labor |
Two-site trip purpose log (W4) |
W4 |
Band P2 — T0+90d → T0+12mo
| P# |
Stream |
Action |
IDs |
| P2.1 |
Land |
Paddock segments numbered (L4); fence repair tiers |
L4, V3 |
| P2.2 |
Infra |
Flow/recovery notes (I2); dry stress note (I4) |
I2, I4 |
| P2.3 |
Business |
V5 complete; B5 kill/pivot rule if needed |
V5, B5 |
| P2.4 |
Business |
V7 lease comps if lease path |
V7, B4 |
| P2.5 |
Insurance |
V9 quotes + gaps closed or accepted |
V9 |
| P2.6 |
Telemetry |
One pilot sensor if G8 done (T3); T4 trip before/after |
T3, T4 |
| P2.7 |
Telemetry |
T5 triage hours; T6 kill if worse than manual |
T5, T6 |
| P2.8 |
Labor |
8-week log complete; W2 surge window; W3 rhythm rev |
W1–W3 |
| P2.9 |
Labor |
W5 coverage gap → hire/neighbor row ? |
W5 |
Band P3 — T0+12mo → T0+24mo (G1 path)
| P# |
Stream |
Action |
IDs |
| P3.1 |
Capacity |
V4 conservative ceiling locked for planning |
V4 |
| P3.2 |
Gates |
G1 evidence packet assembled (V1–V4 + legal use ) |
G1 |
| P3.3 |
Processing |
V6 credible for chosen animal class |
V6 |
| P3.4 |
Finance |
V12 debt limits if used |
V12 |
| P3.5 |
Infra |
Gate IDs match registry (I6) |
I6 |