Skip to content

Parcel intelligence — Claxton home base (East Tennessee two-site)

Purpose: Parcel worksheet for SITE_HOME at Claxton, Anderson County, Tennessee. No homestead-specific soil map is in raw/processed/ yet—sections below stay empty or pending until you file a WSS AOI (or other soils evidence) for the operating footprint.

Anchors: Claxton home base (place) · Five-acre home base (SITE_HOME) · Claxton home base — site intelligence. Package: Parcel intelligence package — East Tennessee two-site.


Location role

Field Value / status
Named anchor Claxton (unincorporated), Anderson County, TN
County / state Anderson County, Tennessee
Planning role SITE_HOME — homestead / control center (see role entity)

Acreage and site function

Field Value / status
Planning acreage (scenario label) ~5 ac (planning default—not a survey)
Deed / survey acreage — pending evidence in raw/ + source-note
Primary functions Residence, records/network head-end posture, staging (see site intelligence)

Soils

Field Value / status
Evidence type — No WSS Soil Map AOI for this parcel in current vault (see missing data register)
Map units / series (summary) — run WSS on homestead polygon; file capture under raw/processed/ + source-note
Hydric / limiting factors — pending

Process reference (not parcel data): Web Soil Survey — product home page (capture).


Slope

Field Value / status
Terrain summary — pending WSS or topo survey on your AOI
Steep-area % (operating polygon) — pending

Hydrology

Field Value / status
Streams / ponds / wetlands (desktop) — pending layers + field verify
Floodplain / karst flags — pending FEMA / local overlays + walk
Stock water / crossings — homestead scope: roof/drainfield vs pasture water at SITE_FARM

Access

Field Value / status
Public road frontage / easements — pending title / field
Internal lanes / gates — pending

Utilities

Field Value / status
Electric service — pending utility
Broadband — pending ISP verification
Water (well / district / catchment) — pending
Onsite sewage (class / setbacks) — pending county / TDEC context: Tennessee — onsite sewage / septic (captures)

Structures

Field Value / status
Existing structures — pending
Planned pads — planning only until permitted

Constraints

Constraint Evidence / note
Regulatory Septic/build permits — county; not inferred here
Easement / neighbor — pending title
Terrain / soils Unknown until WSS AOI filed

Opportunities

Opportunity Depends on
Stronger “brain” / comms posture vs SITE_FARM Utilities verified at this address (see site intelligence)

Telemetry placement candidates

Candidate Power / backhaul Notes
— — No candidate coordinates until site walk + power map

Validation tasks

Task ID / ref Description Status
V1 (local) Soils/slope proof on homestead AOI — Validation plan Open until WSS clip exists
Gap register Claxton and Demory — missing data register — WSS AOI clipped to ~5 ac row Open

Unresolved questions

  1. Legal boundary and exact acreage for the homestead parcel(s)?
  2. OSSS suitability class and setbacks for proposed build envelope?
  3. Measured drive time to SITE_FARM vs ~35 min default?