Off-grid power doctrine — Demory farm site (Campbell County)

Purpose

Give canonical planning guidance for SITE_FARM at Demory (Campbell County) when the business plan treats the production parcel as off-grid-first: solar + battery as the default electrical architecture, without inventing array kW, battery Ah, or NEC details — those require local engineering after measured loads .

Doctrine package (full map: tiers, field nodes, WAN deps, degraded modes, stop rules): Off-grid systems doctrine package — Demory.

Sources (provenance): Off-grid power, field RF, and optional WAN — source index (NREL modules 5–6, Victron Wiring Unlimited, captures).

Paired pages: Power domains and battery-backed infrastructure tiers — Demory, Mesh and field networking strategy — off-grid Demory farm, Off-grid farm execution topology — Demory (Mermaid), Connectivity strategy — Claxton & Demory (WAN secondary to local survivability at farm ).


Architectural stance (policy)

Stance Meaning
Off-grid-first Utility tie is not assumed for core farm loads ; design for standalone PV + storage + optional genset per NREL framing (DC/AC/hybrid coupling choices ) .
Solar + battery default Battery is the energy buffer for night , cloud , and surge loads ; sizing is TBD .
Networking is a load Always-on radios , gateways , and Starlink CPE draw real Wh/day — budget them with other infrastructure , not as “ free ” .

What we do not claim here: optimal string voltage , BMS SKU , grounding solution — cite NEC / AHJ with a PE .


What should be powered continuously (policy)

Category Examples (illustrative) Notes
Safety / welfare interlocks Pump controller logic that prevents dry run ; gate fail-safe solenoids where required Must fail safe without cloud ; may still need local power discipline .
Core field gateway “spine” One MQTT / edge node that aggregates sensors Define “ minimum uptime ” vs duty-cycled repeaters (see mesh strategy ) .
Minimal comms for operator One mesh or LTE path for Tier-1 alerts (policy ) Not every sensor — the smallest set that meets coverage matrix .

What should be duty-cycled or event-driven

Category Examples Notes
Mesh repeaters / Meshtastic nodes Remote hills / fence line Power-saving modes , light sleep , solar + small local battery per Meshtastic power docs (source index) .
Cameras / NVR Motion or scheduled recording Continuous 4K everywhere is a luxury load — match to pilot phase .
Starlink / optional WAN Powered only when egress or admin window needed (policy ) Treat as sheddable during deep SOC events unless you explicitly classify it as critical (Off-grid degraded modes) .
Wi‑Fi HaLow / AP radios High airtime when no traffic Design for sleep / beacon interval tradeoffs — see comparison page .

Solar + battery implications of always-on networking

  • NREL module 6 emphasizes O&M discipline (inspection , cleaning , fault response ) — telemetry that reduces truck rolls still adds constant draw if always on .
  • Always-on IP radios + edge compute compete with water pumps , cold chain , and winter hay handling for the same battery SOC — document priority loads before scaling RF fleet .
  • Placeholder : P_NET_ALWAYS_W = ___ W (meter ) ; E_NET_DAY = ___ Wh/day .

Maintenance burden (operator-real)

Area Burden
Battery / BMS Cell balance , temp , contactor health — NREL O&M themes .
PV array Soiling , snow , vegetation shading new growth .
Inverter / charger Firmware , wiring torque checks (Victron discipline ) .
Field network gear Firmware churn on mesh ; physical theft / lightning at 120 ac .

Pilot vs scale

Phase Power expectation
Phase 0–1 (pilot ) One proven DC bus segment + one gateway + minimal always-on RF ; measure before second array string or second battery bank .
Scale Redundant PV , genset policy , load shedding bus — only after G1 / water / fence gates per business plan .