Skip to content

Local evidence package — East Tennessee two-site

Purpose: Durable routing for measured and site-specific execution data for SITE_HOME (Claxton, Anderson County) and SITE_FARM (Demory, Campbell County)—without scattering facts across unrelated analyses. Does not invent parcel lines, utilities, or loads; tables are append-only friendly (update rows as evidence lands in raw/ + source-notes).

Package boundary: Canonical home for field-measured and desk-cited baselines (inventory, infra, utility, loads, templates, workflow). Not the full business plan narrative—that stays on the package page and planning framework; not a duplicate of site intelligence essays (those synthesize county context; this package holds tables and workflow).

Integration: New measured rows should cross-link Parcel intelligence package / worksheets when the fact is parcel-shaped, and append wiki/log.md ingest when batch-sized—see Package artifact backlog — canonical East Tennessee packages for artifact gaps (WAN log, energy worksheet, etc.).

Spine: East Tennessee two-site farm business plan (package) · Local site and county intelligence · Two-site smart farm operations · Execution dossier — Phase 0–1 (hub).

Epistemic legend (used across package pages):

Class Meaning
Measured Direct reading, survey, metered data, your log with date/method
Reported Third-party statement (utility, county, neighbor)—cite source
Assumption Planning default—disconfirm with field work
Unknown Not yet collected—blocks decisions listed on each page

Package map

# Page Role
1 Site inventory baseline — Claxton home base Buildings, yards, access, storage—homestead footprint
2 Site inventory baseline — Demory farm site Fields, lanes, water points, structures—production footprint
3 Infrastructure inventory baseline — both sites Fences, roads, water movement, gates—cross-site table
4 Utility and service baseline — both sites Electric, water, septic, comms, fuel—service accounts
5 Loads register — known, estimated, unknown (two sites) Electrical / duty-cycled loads; power budget hooks
6 Field observation template package — two-site Repeatable visit forms (date, route, observations)
7 Parcel evidence intake and validation workflow — two-site How evidence moves raw → wiki without breaking provenance
8 Field verification program — Phase 0–1 (Claxton and Demory) Structured site walks, access/drainage/utilities/power/sensors/gates—methods + evidence per row (no invented results)

Desk research (state + national; no parcel outcomes embedded on portal pages)

Existing layers (unchanged scope): Claxton home base — site intelligence, Demory farm — site intelligence, Parcel intelligence package, Claxton and Demory — missing data register.


Entities