Risk register and mitigation strategy
Purpose
Maintain a working risk register for the two-site, telemetry-heavy, family-labor farm business plan: market, weather, labor, capital, operations, technology, legal/liability. Likelihood and impact are local judgments—revise quarterly or after incidents.
Operational matrix: Business risk register — two-site smart farm (monthly review option).
Hub: East Tennessee two-site farm business plan — planning framework.
Decisions supported by this page
| Decision |
This page provides |
| Insurance limits and umbrella |
Liability rows |
| Maximum debt and herd size |
Financial + operational rows |
| Automation scope |
Tech false-confidence + alert fatigue |
| When to downsize enterprise |
Mitigation tied to measurable triggers |
Method
- Score L (likelihood) and I (impact) 1–5; priority = L × I (optional).
- Two-site and telemetry risks are first-class, not footnotes.
Register (living)
| ID |
Risk |
Category |
L |
I |
Mitigation |
Phase |
| R1 |
Cattle price crash |
Market |
3 |
4 |
Timing; smaller herd; lease buffer |
2–4 |
| R2 |
Drought / forage gap |
Weather |
3 |
4 |
Destock policy; hay plan; water redundancy |
1–3 |
| R3 |
Key person injury / absence |
Labor |
2 |
4 |
Cross-training; reduce complexity; insurance |
0–4 |
| R4 |
Equipment failure at peak |
Ops |
3 |
3 |
Spares; custom hire number on fridge |
2–3 |
| R5 |
Fence failure / escape |
Ops |
2 |
4 |
Inspection cadence; hot wire maintenance |
2–4 |
| R6 |
Debt overhang |
Financial |
2 |
5 |
Hard stop rules; match term to margin |
1–4 |
| R7 |
Broker / comms down |
Tech |
3 |
2 |
Runbooks; safe defaults at edge |
1–4 |
| R8 |
False alert fatigue |
Tech |
4 |
3 |
Triage SOP; corroboration before mute |
2–3 |
| R9 |
Cyber / remote access breach |
Tech |
2 |
4 |
Segmentation; 2FA; asset inventory mindset |
2–4 |
| R10 |
Liability (visitor / animal / road) |
Legal |
2 |
5 |
Insurance; signage; separate agritourism if ever |
2–4 |
| R11 |
Regulatory / zoning surprise |
Legal |
2 |
3 |
County conversation early |
0–1 |
| R12 |
Two-site delay cost (slow response at 120) |
Ops |
3 |
3 |
Batch rules; water/gate telemetry priority |
0–4 |
| R13 |
Theft / vandalism at remote parcel |
Ops |
2 |
3 |
Access control, neighbor awareness; not camera-only |
2–4 |
| R14 |
Terrain / road / sediment (steep gravelly soils; lane erosion) |
Ops |
3 |
4 |
Earthwork + drainage with fence plan; Campbell evidence: Demory site intelligence |
1–3 |
| R15 |
Map / AOI mismatch (WSS session ≠ deed or ≠ ~120 ac operating area) |
Ops |
2 |
3 |
Redraw AOI; clip map units to fields; label MAP_AUTHORITY |
0–1 |
| R16 |
WAN brownout + off-grid power stress collapses “remote triage saves trips” |
Tech/Ops |
3 |
4 |
Local-first state + manual SoT; Pcrit metering per off-grid doctrine; no privileged remote actuation before Observability, secrets, and trust bar — homelab / farm edge trust bar; Off-grid degraded modes — power and connectivity |
0–4 |
| R17 |
Cumulative operator burden (travel + off-grid O&M + sensors/gateways + backup/restore + alert triage + drills) exceeds family capacity—hidden by “we have docs” |
Labor/Tech |
4 |
4 |
Cut parallel pilots; calendar triage + restore drills; Operator burden review; enforce NS-2 / EG-LAB; hire or defer stack scope |
0–1 |
What changed: R14–R15 from Campbell WSS + two-county NASS context; R16 from WAN-optional + battery-backed doctrine integration (2026-04); R17 hostile burden stack (2026-04); parcel facts still verify locally.
Mitigation themes
| Theme |
Actions |
| Liquidity |
Operating reserve months (N); lease income where ethical |
| Complexity |
One major new system per year after Phase 2 |
| Telemetry |
Alert budget (hours/week); annual de-scope review |
| Labor |
Weekly rhythm + documented surge overrides |
Known facts
Assumptions
| ID |
Statement |
| A1 |
Farm insurance is carried at levels lenders and comfort require—verify with agent. |
Open questions
Iterative updates
- Add owner name per row locally; close risks only when mitigation is verified.
- After major weather or market event, re-score R1–R2.
Related pages