Parcel evidence intake and validation workflow — two-site¶
Purpose: Deterministic path from field / desk evidence → raw/ → source-notes → parcel worksheets and site baselines—without inventing boundaries, APNs, or utility facts.
Hub: Parcel intelligence package — East Tennessee two-site.
Local evidence package: Local evidence package — East Tennessee two-site.
Worksheets: Parcel intelligence — Claxton home base · Parcel intelligence — Demory farm site.
Field verification program (Phase 0–1): Field verification program — Phase 0–1 (Claxton and Demory) — action-oriented checklist tables (site, method, evidence, V*/G* hooks, desktop vs field). Use it to plan visits; use this workflow to promote outcomes into raw/ → source-notes → baselines/worksheets.
What counts as evidence¶
| Tier | Examples | Wiki treatment |
|---|---|---|
| Primary | Deed, recorded plat, survey, well permit, stamped engineering | Cite raw/ path; quote short legal only with care |
| Secondary | County GIS print, tax card, FSA map | Reported—note capture date and layer |
| Tertiary | Satellite, neighbor statement | Reported or assumption—field verify for fences |
Intake steps¶
- Drop immutable file under
raw/inbox/(or pipeline perdocs/workflows/ingest.md); do not rewrite processed sources. - Create or update
wiki/source-notes/<stable-name>.mdwith frontmattersource_ids/ path and what the file does and does not prove. - Update the parcel worksheet row: Fact class (measured / reported / assumption / unknown), source, date.
- Cross-link site inventory / infrastructure / utility baselines when the fact is operational (gate width, easement width)—not duplicate legal description on every page.
- Append
wiki/log.mdingestentry. - Run
uv run python scripts/validate_wiki.py.
Desk tools (before field work)
- State/county GIS and flood/climate portals (primary URL table—not parcel outcomes):
Tennessee two-site — official parcel, GIS, flood, and climate portals. - Utility excavation: TN 811 process captures in
Inbox batch — Frigate, SOPS, Prometheus, TN811, NRCS/UT (2026-04-18)— ticket / Positive Response are project records, not wiki defaults.
Validation rules (two-site)¶
| Check | Pass criteria |
|---|---|
| APN / deed alignment | Single authoritative line in worksheet; conflicts get dated note + confidence |
| Acreage | NASS / WSS stay on site intelligence; worksheet may hold field measured sub-areas |
| Utility account | Not in wiki in full—redacted in raw/; wiki lists provider + unknowns only |
| Fence = parcel line? | Never assumed—Unknown until survey or corner tie |
Conflict handling¶
If new evidence contradicts an old row: do not silent delete—add dated subsection on worksheet or missing data register with supersedes pointer and review_status if needed.
Decision gates¶
| Decision | Blocked until |
|---|---|
| Capital fence line | Survey or staked agreement + title review |
| Permanent water line easement | Recorded easement or deed language |
| Official farm address for permits | County / 911 confirmed |