Tennessee two-site — evidence hardening audit (2026-04)

Purpose

Durable record of a 2026-04 pass to move the vault from strong execution theory toward a more evidence-rich operational knowledge base: what was added, what gaps remain, and which canonical pages changed. Does not claim parcel-specific facts—those still require deed, field, and county work.

Spine: East Tennessee two-site farm business plan (package) · Local site and county intelligence · Authoritative execution evidence cluster — East Tennessee.


What was added (this pass)

A. Local parcel, GIS, flood, climate — desk portals

B. Physical infrastructure — locate, fence, water, irrigation

C. Observability and secrets — doctrine layer

D. Video / NVR (Frigate)

E. Hubs and index


Execution gaps (still open)

Gap Why it remains Next step (non-wiki)
Deed-aligned AOI for ~5 ac and ~120 ac operating polygons Wiki cannot infer legal boundaries Survey / deed / county GIS tie with field stakes
Claxton WSS AOI capture in raw/ Not yet filed for homestead footprint Run WSS; file raw/ + source-note per workflow
FEMA FIRMette or LOMR context for structures Desk screening ≠ permit determination County floodplain admin + insurance agent
NOAA normals → microclimate at paddock Normals are station statistics On-site weather telemetry + seasonal log
811 ticket history for planned trenches Process captured; not project records Operator tickets + Positive Response logs
Production observability stack choice (Alloy vs Prom/Loki split) Team and hardware dependent Platform decision memo pilot gate

Canonical pages changed (checklist)