Validation backlog and decision gates

Purpose

List what must be proven (with evidence) before major spend, scale, or salary claims. Decision gates tie validation tasks to permission to spend or advance phase. This page stays valid while field data is incomplete—status columns and gate passes update as reality arrives.

Stricter spend gate worksheet: Validation backlog — assumptions before major spend.
Scenario context: Enterprise options analysis — 120-acre East Tennessee two-site smart farm.
Hub: East Tennessee two-site farm business plan — planning framework.
24-month cadence: Validation and pilot plan — first 24 months (East Tennessee two-site) — validation matrix, pilot streams, phase gates, cheap proofs; Pilot and recon checklists.

Execution dossier (Phase 0–1): Hub · First 90 days · Master checklist · Decision memo.

Integration (2026-04): Business plan integration revision audit — how V* / G* tasks now bind to local evidence, off-grid/WAN, sensors, platform/backup/observability, and authority packages; field execution rows in Field verification program — Phase 0–1.

Phase 0–1 execution gates (EG): Execution gates — Phase 0–1 (East Tennessee two-site) — pass/fail tables by domain (local evidence, site/infra, off-grid power, connectivity + trust bar, sensors, platform/backup/observability, labor, financial); pilot allowed vs production allowed; composite mapping to G1-class production posture.

Decisions supported by this page

Decision This page provides
Go / no-go on Phase 2 fence/water/herd Gate G1
Go / no-go on Phase 3 scale Gate G2
Go / no-go on Phase 4 salary narrative Gate G3
What research tasks block which CAPEX Task IDs V1–Vn

Backlog rules

  1. Nothing moves from “assumed” to “known” without evidence (file, photo set, letter, spreadsheet link in your system—not necessarily in raw/ until ingested).
  2. Drop duplicate tasks that are one county call away.
  3. Prioritize items that unlock Phase 2 capital safely.

Research and validation tasks

ID Task Phase Closes Evidence Status
V1 Soil map + key limitation (wet / steep) 1 Rotation design NRCS / lab open
V2 Water rights + well/surface law check 0–1 Stocking Attorney / well report open
V3 Fence condition walk + photo log 1 CAPEX order Album + map open
V4 Carrying capacity estimate (conservative) 1 Herd size Extension method or consult open
V5 Auction sale bills (~12 weeks) 1 Price reality PDFs open
V6 Processing availability (dates / distance) 1–2 Marketing options Call log open
V7 Lease rate comps (per acre) 1 Lease vs graze Comps (legal) open
V8 County zoning + ag structures 0–1 Building plan Zoning letter open
V9 Insurance quotes (farm + umbrella) 1–2 Risk register Binder open
V10 Cell coverage walk (tanks / gates) 1 Radio plan Map screenshot open
V11 Family hour budget (real) 0 Labor model Spreadsheet open
V12 Debt capacity + FSA programs 1 Financing Lender notes open

Decision gates

Gate Criteria (must pass) Unlocks
G1 V1–V4 minimum + no legal blocker on intended use Phase 2 fence/water/herd spend
G2 Positive operating cash year or explicit subsidy budget with end date Phase 3 scale
G3 Margin + labor tests documented Phase 4 salary-replacement claim

G1 “production” honesty: Checklist V rows are necessary but not sufficient for production posture. Before treating G1 as passed for irreversible Phase 2 CAPEX, satisfy the production composite in Execution gates — Phase 0–1 (EG gates)—or obtain a dated, written waive naming which EG production bars are intentionally deferred.

Align with G1–G8 in validation-backlog-before-major-spend for major $ definition.

Next 90 days (relative to T0)

Use First 90 days — Phase 0–1 execution for week-by-week actions. At a minimum:

Week band (after T0) Actions
1–2 V11, V8; numeric stop rules in Vision
3–6 V1, V3, V5 started
7–12 V4, V7, V10; pilot telemetry scope locked (one cluster)

T0 = execution start date (see Execution dossier hub).

Known facts

ID Statement
K1 Validation is an explicit part of the business plan package—not an afterthought.
K2 Enterprise details on 120 acres may change; gates still apply before scale.

Assumptions

ID Statement
A1 Each task V has a named owner and due date* in your tracker.

Open questions

ID Question
Q1 Budget for external consultant (forage/carrying capacity)?
Q2 EQIP / NRCS timeline if pursued?
Q3 Evidence storage: wiki raw/ ingest vs family folder only?

Iterative updates

  • Flip Status to done with evidence pointer; never erase done rows—append corrections.
  • When G1 passes, date it and link to capital row in Capital phasing table.