Smart Farm Wiki — repository implementation plan (business plan integration)¶
1. Implementation summary¶
The East Tennessee two-site farm business plan and operational artifacts are largely already implemented under wiki/analyses/ with index and knowledge-synthesis entry points. What remains is structural: a dedicated topic hub (hub-and-spoke) so the business-plan cluster is discoverable without reading index.md linearly; tight links from overview, domain content overview, and strategic implementation backlog; optional secondary topic hubs from information-architecture-decision-safe-operations only where they add navigation without duplicating analyses.
Principles
- No ornamental pages: one two-site operations topic hub, not a duplicate “summary of summaries.”
- Foundational first: hub + inbound links +
overview.mdbefore optional telemetry/security topic splits. - Evidence later: numeric CAPEX, revenue, salary targets stay placeholders until family supplies data; wiki tracks validation IDs instead of inventing numbers.
2. Proposed file tree¶
New files to create¶
| Path | Role |
|---|---|
wiki/topics/two-site-smart-farm-operations.md |
Topic hub: spokes to ET business plan framework, dual-site ops models, operational artifacts, runbooks, comparisons—single navigation surface for “5 ac + 120 ac + telemetry.” |
Optional later (only if navigation pressure justifies; analyses already cover substance):
| Path | Role |
|---|---|
wiki/topics/field-telemetry-and-backhaul.md |
Hub: field telemetry ref arch, LoRa/MQTT topic, instrumentation matrix, comparisons—avoid if knowledge-synthesis + analyses suffice. |
wiki/topics/spatial-data-and-farm-map-hygiene.md |
Hub: farm spatial model, PostGIS/farm data topic, registry standard—optional. |
Existing files to update (inbound links / one section each)¶
| Path | Update |
|---|---|
wiki/overview.md |
Add bullet: ET two-site business plan hub + topic hub (when created). |
wiki/index.md |
Under Topics, add Two-site smart farm operations entry; keep Analyses list in sync. |
wiki/analyses/domain-content-overview.md |
Short pointer under business/strand to planning framework + topic hub. |
wiki/analyses/information-architecture-decision-safe-operations.md |
Mark two-site topic hub as shipped or link file when created. |
wiki/analyses/implementation-backlog-strategic-audit.md |
Cross-link operational artifacts + hostile review as done / next as appropriate. |
wiki/topics/knowledge-synthesis.md |
Add topic hub link alongside existing business-plan bullets. |
wiki/analyses/east-tennessee-two-site-farm-business-plan-framework.md |
Add “Topic hub” outbound link in Links section when two-site-smart-farm-operations.md exists. |
Do not create separate pages for: executive summary duplicate, third “index of the index,” or per-strand business-plan copies.
3. Page-by-page change plan¶
Status: exists = already in repo; planned = recommended next edit.
| Filename | Title | page_type | Purpose | Dependencies | Key outbound links | Key inbound to add |
|---|---|---|---|---|---|---|
topics/two-site-smart-farm-operations.md |
Two-site smart farm operations | topic | Navigation hub for 5 ac home base + 120 ac production + plan + artifacts + runbooks | ET framework, dual-site analyses | Framework, executive summary, recommended strategy, two-site-operations-model-5ac-*, field telemetry ref arch, hostile review, validation backlog |
From overview.md, domain-content-overview.md, knowledge-synthesis.md, framework.md |
overview.md |
Wiki overview | overview | North-star entry | — | +1 bullet: two-site business plan + topic hub | — |
index.md |
Wiki index | meta | Catalog | — | Topic entry for hub | — |
analyses/domain-content-overview.md |
Domain content overview | analysis | Strand steering | — | Link to ET framework or topic hub under business strand | From hub “related” |
analyses/information-architecture-decision-safe-operations.md |
Information architecture — decision-safe operational brain | analysis | IA target | — | Update “first drafts” / hub list with topic path | — |
analyses/implementation-backlog-strategic-audit.md |
Implementation backlog — strategic audit | analysis | P0–P3 build list | — | Point to completed operational artifacts + hostile review | — |
topics/knowledge-synthesis.md |
Knowledge synthesis | topic | Cross-cutting entry | — | Topic hub URL | — |
analyses/east-tennessee-two-site-farm-business-plan-framework.md |
ET two-site farm business plan — planning framework | analysis | Plan hub | — | topics/two-site-smart-farm-operations.md |
— |
Already exists (no new file; optional incremental edits only)
| Filename | Notes |
|---|---|
analyses/east-tennessee-two-site-farm-business-plan-*.md (13 files) |
Business plan package—stable; revise only when hostile review or validation closes items. |
analyses/two-site-operations-model-5ac-homebase-120ac-production.md etc. (8 artifacts) |
Operational matrices—fill placeholders over time. |
analyses/*runbook*.md |
SOP-class analyses—link from topic hub. |
comparisons/lorawan-vs-meshtastic-*.md (4 files) |
Linked from smart-tech + hub. |
4. Minimum coherent merge set (one PR)¶
The smallest change set that makes the business-plan work structurally navigable:
- Create
wiki/topics/two-site-smart-farm-operations.md— done: hub-and-spoke tables, links only. - Update
wiki/overview.md— done: bullet 7 for two-site plan + implementation plan. - Update
wiki/index.md— done: Topics entry. - Update
wiki/topics/knowledge-synthesis.md— done: topic hub link. - Update
wiki/analyses/east-tennessee-two-site-farm-business-plan-framework.md— done: “Topic hub” section. - Append
wiki/log.md— pending on merge:refactor | Topic hub + implementation plan.
Remaining optional from this set: patch domain-content-overview, information-architecture-*, implementation-backlog-strategic-audit per Phase B.
Run uv run python scripts/validate_wiki.py --strict.
This is foundational navigation; it does not require filling numeric placeholders.
5. Phased execution order¶
| Phase | Scope | Outcome |
|---|---|---|
| A — Navigation (P0) | Minimum coherent merge set above | Hub-and-spoke discoverable |
| B — IA alignment (P1) | Patch domain-content-overview, information-architecture-*, implementation-backlog-strategic-audit |
Strategic docs reflect shipped pages |
| C — Evidence binding (P1) | Where plan cites validation, ensure validation-backlog IDs match validation-backlog-before-major-spend G* gates |
Traceable gates |
| D — Optional topic hubs (P2) | field-telemetry-and-backhaul, spatial-data-and-farm-map-hygiene only if orphan report or user requests |
Deeper topic layering |
| E — Numeric fill (ongoing) | Revenue, capital phasing, revenue milestones, vision stop rules—family data only | Decision-safe economics |
6. Pages that should remain placeholders until evidence exists¶
Keep status: draft or explicit TBD tables for:
| Page | Why |
|---|---|
east-tennessee-two-site-farm-business-plan-revenue-and-phased-income.md |
HH_NEED, channel prices |
revenue-milestone-model-supplemental-to-salary-replacement.md |
Milestone $ and years |
capital-phasing-table-years-0-10-two-site-smart-farm.md |
Row $, financing terms |
east-tennessee-two-site-farm-business-plan-vision-and-constraints.md |
Numeric stop rules |
family-labor-model-and-coverage-matrix-two-site-smart-farm.md |
Named roles, real hours |
instrumentation-priority-matrix-two-site-smart-farm.md |
Scores after pilot |
validation-backlog-before-major-spend-two-site-smart-farm.md |
Pass checkboxes until evidence files |
east-tennessee-two-site-farm-business-plan-hostile-internal-review.md |
Revise after first year of books |
Do not mark framework, enterprise options, recommended strategy, roadmap, runbooks, or comparisons as “waiting for evidence” for structure—they are already decision-grade at qualitative level.
Links¶
Business plan wiki — Git-friendly execution sequence— PR batches, commit order, landing order, minimum usable stateEast Tennessee two-site farm business plan — planning frameworkHostile internal reviewInformation architecture — decision-safe operational brain