Skip to content

Smart Farm Wiki — repository implementation plan (business plan integration)

1. Implementation summary

The East Tennessee two-site farm business plan and operational artifacts are largely already implemented under wiki/analyses/ with index and knowledge-synthesis entry points. What remains is structural: a dedicated topic hub (hub-and-spoke) so the business-plan cluster is discoverable without reading index.md linearly; tight links from overview, domain content overview, and strategic implementation backlog; optional secondary topic hubs from information-architecture-decision-safe-operations only where they add navigation without duplicating analyses.

Principles

  • No ornamental pages: one two-site operations topic hub, not a duplicate “summary of summaries.”
  • Foundational first: hub + inbound links + overview.md before optional telemetry/security topic splits.
  • Evidence later: numeric CAPEX, revenue, salary targets stay placeholders until family supplies data; wiki tracks validation IDs instead of inventing numbers.

2. Proposed file tree

New files to create

Path Role
wiki/topics/two-site-smart-farm-operations.md Topic hub: spokes to ET business plan framework, dual-site ops models, operational artifacts, runbooks, comparisons—single navigation surface for “5 ac + 120 ac + telemetry.”

Optional later (only if navigation pressure justifies; analyses already cover substance):

Path Role
wiki/topics/field-telemetry-and-backhaul.md Hub: field telemetry ref arch, LoRa/MQTT topic, instrumentation matrix, comparisons—avoid if knowledge-synthesis + analyses suffice.
wiki/topics/spatial-data-and-farm-map-hygiene.md Hub: farm spatial model, PostGIS/farm data topic, registry standard—optional.
Path Update
wiki/overview.md Add bullet: ET two-site business plan hub + topic hub (when created).
wiki/index.md Under Topics, add Two-site smart farm operations entry; keep Analyses list in sync.
wiki/analyses/domain-content-overview.md Short pointer under business/strand to planning framework + topic hub.
wiki/analyses/information-architecture-decision-safe-operations.md Mark two-site topic hub as shipped or link file when created.
wiki/analyses/implementation-backlog-strategic-audit.md Cross-link operational artifacts + hostile review as done / next as appropriate.
wiki/topics/knowledge-synthesis.md Add topic hub link alongside existing business-plan bullets.
wiki/analyses/east-tennessee-two-site-farm-business-plan-framework.md Add “Topic hub” outbound link in Links section when two-site-smart-farm-operations.md exists.

Do not create separate pages for: executive summary duplicate, third “index of the index,” or per-strand business-plan copies.


3. Page-by-page change plan

Status: exists = already in repo; planned = recommended next edit.

Filename Title page_type Purpose Dependencies Key outbound links Key inbound to add
topics/two-site-smart-farm-operations.md Two-site smart farm operations topic Navigation hub for 5 ac home base + 120 ac production + plan + artifacts + runbooks ET framework, dual-site analyses Framework, executive summary, recommended strategy, two-site-operations-model-5ac-*, field telemetry ref arch, hostile review, validation backlog From overview.md, domain-content-overview.md, knowledge-synthesis.md, framework.md
overview.md Wiki overview overview North-star entry — +1 bullet: two-site business plan + topic hub —
index.md Wiki index meta Catalog — Topic entry for hub —
analyses/domain-content-overview.md Domain content overview analysis Strand steering — Link to ET framework or topic hub under business strand From hub “related”
analyses/information-architecture-decision-safe-operations.md Information architecture — decision-safe operational brain analysis IA target — Update “first drafts” / hub list with topic path —
analyses/implementation-backlog-strategic-audit.md Implementation backlog — strategic audit analysis P0–P3 build list — Point to completed operational artifacts + hostile review —
topics/knowledge-synthesis.md Knowledge synthesis topic Cross-cutting entry — Topic hub URL —
analyses/east-tennessee-two-site-farm-business-plan-framework.md ET two-site farm business plan — planning framework analysis Plan hub — topics/two-site-smart-farm-operations.md —

Already exists (no new file; optional incremental edits only)

Filename Notes
analyses/east-tennessee-two-site-farm-business-plan-*.md (13 files) Business plan package—stable; revise only when hostile review or validation closes items.
analyses/two-site-operations-model-5ac-homebase-120ac-production.md etc. (8 artifacts) Operational matrices—fill placeholders over time.
analyses/*runbook*.md SOP-class analyses—link from topic hub.
comparisons/lorawan-vs-meshtastic-*.md (4 files) Linked from smart-tech + hub.

4. Minimum coherent merge set (one PR)

The smallest change set that makes the business-plan work structurally navigable:

  1. Create wiki/topics/two-site-smart-farm-operations.md — done: hub-and-spoke tables, links only.
  2. Update wiki/overview.md — done: bullet 7 for two-site plan + implementation plan.
  3. Update wiki/index.md — done: Topics entry.
  4. Update wiki/topics/knowledge-synthesis.md — done: topic hub link.
  5. Update wiki/analyses/east-tennessee-two-site-farm-business-plan-framework.md — done: “Topic hub” section.
  6. Append wiki/log.md — pending on merge: refactor | Topic hub + implementation plan.

Remaining optional from this set: patch domain-content-overview, information-architecture-*, implementation-backlog-strategic-audit per Phase B.

Run uv run python scripts/validate_wiki.py --strict.

This is foundational navigation; it does not require filling numeric placeholders.


5. Phased execution order

Phase Scope Outcome
A — Navigation (P0) Minimum coherent merge set above Hub-and-spoke discoverable
B — IA alignment (P1) Patch domain-content-overview, information-architecture-*, implementation-backlog-strategic-audit Strategic docs reflect shipped pages
C — Evidence binding (P1) Where plan cites validation, ensure validation-backlog IDs match validation-backlog-before-major-spend G* gates Traceable gates
D — Optional topic hubs (P2) field-telemetry-and-backhaul, spatial-data-and-farm-map-hygiene only if orphan report or user requests Deeper topic layering
E — Numeric fill (ongoing) Revenue, capital phasing, revenue milestones, vision stop rules—family data only Decision-safe economics

6. Pages that should remain placeholders until evidence exists

Keep status: draft or explicit TBD tables for:

Page Why
east-tennessee-two-site-farm-business-plan-revenue-and-phased-income.md HH_NEED, channel prices
revenue-milestone-model-supplemental-to-salary-replacement.md Milestone $ and years
capital-phasing-table-years-0-10-two-site-smart-farm.md Row $, financing terms
east-tennessee-two-site-farm-business-plan-vision-and-constraints.md Numeric stop rules
family-labor-model-and-coverage-matrix-two-site-smart-farm.md Named roles, real hours
instrumentation-priority-matrix-two-site-smart-farm.md Scores after pilot
validation-backlog-before-major-spend-two-site-smart-farm.md Pass checkboxes until evidence files
east-tennessee-two-site-farm-business-plan-hostile-internal-review.md Revise after first year of books

Do not mark framework, enterprise options, recommended strategy, roadmap, runbooks, or comparisons as “waiting for evidence” for structure—they are already decision-grade at qualitative level.