Demory farm site (place, Campbell County, Tennessee)¶
What this entity is: The named geographic anchor in the vault for SITE_FARM — Demory, Campbell County, Tennessee, used as a planning label (not a legal property abstract). Pair it with the role entity 120-acre production farm (SITE_FARM) — ET two-site.
Role in the two-site system¶
- Primary production surface for enterprise bets (livestock, forage, crops, revenue-facing field infra), field telemetry, and eyes-on work that does not belong at
Claxton home base (place). - County context:
Campbell County, Tennessee (two-site context); cross-county framing:Anderson County vs Campbell County — two-site operating implications.
Known facts (vault-aligned, non-parcel)¶
- Place label: Demory is used as the vault planning name for
SITE_FARM— seeDemory farm — site intelligence. - County rent statistic (survey, not your lease): 2024 NASS county estimate $27.50/ac non-irrigated cropland for Campbell —
nass-cash-rents-all-crops-tn-2024.pdf; source-noteNASS cash rents TN 2024. - Web Soil Survey (processed capture, session-specific): Vault holds a soil map tab capture for a Campbell County AOI tied to this intelligence thread — reported AOI total 558.6 ac; dominant map units FbF / FbD / TaF (steep, gravelly in aggregate). Not proof that every acre matches the ~120 ac planning label — clip to your operating boundary. Raw:
web-soil-survey-campbell-county-aoi-soil-map-tab-capture-2026-04-18.md; source-noteCampbell County — WSS AOI soil map tab (capture).
Assumptions (disconfirm with field evidence)¶
- AOI vs operating farm: The WSS session AOI may include tracts or buffers beyond the ~120 ac scenario — re-draw WSS to the management polygon.
- Terrain / ops: Sloped ground favors earthwork discipline, internal lanes, fence-on-contour, and stock-water investment — micro-pockets of better land may exist; walk and soil-test.
- Utilities: Power / three-phase / retail service may be weaker than at Anderson home base — verify with providers.
Linked analyses¶
Demory farm — site intelligence (Campbell County, Tennessee)— primary synthesis for this anchor.Two-site operating model — 5-acre home base and 120-acre farm— distance tax, trailer/access implications.Farm spatial model and asset registry standard— paddock / asset IDs when polygons exist.Validation and pilot plan — first 24 months — East Tennessee two-site— V1/V7 local gates.Rural road and driveway erosion— context for lanes and sediment (topic hub).Claxton and Demory — missing data register— parcel-level gaps.Site inventory baseline — Demory farm site— field inventory tables (fields, structures, water points); complements site intelligence.Local evidence package — East Tennessee two-site— router for baselines + loads + field templates.Off-grid systems doctrine package — Demory— off-grid-first power + local RF + WAN-optional overlay + degraded modes + stop rules.Farm sensor architecture — Demory farm site— long-range field sensing (LoRaWAN / HaLow / mesh); Starlink as WAN only; reference/pilot/degraded diagrams.Sensor checklist matrix — Demory farm— planning matrix by use case (not parcel placements).
Linked source notes¶
NASS cash rents TN 2024— county rent estimates.Campbell County — WSS AOI soil map tab (capture)— soils evidence for the captured AOI.Web Soil Survey & 3D Elevation — captures— how WSS fits the authority chain.Authoritative execution evidence cluster — East Tennessee— NRCS, Extension, and program context (not a substitute for site visit).
Key decisions tied to this entity¶
- Earthwork / access: Treat internal roads, gates, and pads as high-leverage CAPEX given slope aggregate; sequence with sediment and drainage thinking (see site intelligence + risk register links in analyses).
- Telemetry ROI: Field endpoints and stock-water observation often justify instrumentation here before cosmetic automation elsewhere.
- Land intelligence before herd scale: Align Phase 1 work to soils, water, fence plan, handling MVP before scaling livestock (see recommended enterprise strategy in package).
Outstanding unknowns¶
- Which acres are farm vs woodland vs building envelope — deed + sketch + walk; align to paddock IDs in spatial model.
- Operational permits — septic/well/ag structures: county records, not WSS.
- EQIP / NRCS eligibility — site visit and conservation planning process.
- Precise slope distribution on the operating ~120 ac — clip soils to field polygons if AOI is larger.
Parcel worksheet¶
Parcel intelligence — Demory farm site— structured fill-in page (vault WSS session + pending clip to operating acres).
Related infrastructure patterns (not parcel-specific)¶
Farm water infrastructure system— stock water, crossings, storage.Farm on-site power system— drops, solar, loads at production scale.Field telemetry network — two-site— gateways, backhaul, field radios.Farm parcels and land units— stable land IDs.