Two-site operating model — 5-acre home base and 120-acre farm¶
Purpose¶
Define how a single farm business runs when family and command infrastructure sit on a ~5-acre home base (SITE_HOME) and primary production and revenue sit on a ~120-acre parcel (SITE_FARM), separated by COMMUTE_ONE_WAY (planning default ~35 minutes one way—measure and log; do not plan on “it feels shorter”).
This page is operational, not legal or tax advice. It stays valid while enterprise mix on the 120 acres is still open: it describes where work and capital land, not which commodity wins.
Binding stance: COMMUTE_ONE_WAY ≈ 35 min is a structural tax, not a rounding error. Routine unnecessary trips are treated as margin and morale destroyers. Batching, low daily physical touch, and remote observability are first-class design filters—not optional optimizations.
Relationship to generic dual-site pattern¶
For a production-led two-site layout without the East Tennessee plan’s named sites, see:
Package overlays (stricter policy + disqualifiers):
Trip batching and site visit policyTwo-site structure disqualifiersEnterprise unit economics — worksheet methodology—R_SPLIT, MVCM gates
Decisions supported by this page¶
| Decision | This page provides |
|---|---|
| Where to place CAPEX (homestead vs production parcel) | Split tables; irreversible vs relocatable |
| What counts as a worth-it trip to the 120 | Links to trip policy; distance-tax tiers |
| What is centralized at home vs distributed in-field | Comms, broker, records authority, spares |
| Emergency response when distance and darkness matter | Tier link to coverage matrix + runbooks |
| Whether an enterprise survives the split | Distance-tax rules + disqualifiers |
Operating picture¶
Site roles (non-negotiable facts from the business plan)¶
| Site | Size (planning) | Role |
|---|---|---|
SITE_HOME |
~5 ac | Residence; long-run smart operations center (network, broker, backups, workshop/lab, development). Not the primary commercial production land. |
SITE_FARM |
~120 ac | Primary production decision surface: livestock, forage, crops, infrastructure tied to revenue. All major enterprise bets resolve here first. |
Named anchors (local evidence) — SITE_HOME Claxton / Anderson County; SITE_FARM Demory / Campbell County. Detail: Claxton home base — site intelligence, Demory farm — site intelligence, Anderson vs Campbell — operating implications.
| County / site | Plan implication (tightened from vault sources) |
|---|---|
| Anderson (Claxton) | 2024 NASS non-irrigated cropland rent $28.50/ac county estimate—ballpark for lease comps only; parcel soils not in corpus—run WSS on homestead AOI. |
| Campbell (Demory) | NASS $27.50/ac same category; processed WSS AOI shows steep gravelly map units dominant—reinforces T0–T1 touch tiers for grazing vs T3 row-crop primary, and internal road / drainage as early CAPEX peers with fence/water. |
What changed because of local evidence: County rent rows and Campbell terrain signal tighten V7 lease bands and earthwork/lane sequencing—they do not replace P90 drive logs or G1 soil/water proofs.
Functions by location¶
| Function | Preferred location | Notes |
|---|---|---|
| Broker, dashboards, config store, backup target | SITE_HOME |
Stable power; daily physical access for ops |
| Field gateways, tank/pump sensing, gate position | SITE_FARM |
Edge; must fail safe when backhaul is down |
| Livestock handling, stored feed, equipment | SITE_FARM |
Mass and mess stay off the 5 ac |
| CAD, 3D printing for jigs/repair parts | SITE_HOME |
Design at home; install at SITE_FARM |
| Authoritative business records | Choose one: SITE_HOME + cloud, or cloud with offline export |
Write the choice in Farm spatial model and asset registry standard or farmOS policy |
Starlink / satellite WAN — where it sits (canonical)¶
Topology reference (diagrams, not a bill of materials): Two-site smart farm — network topology and WAN/edge reference (Mermaid).
| Site | Starlink / LEO broadband role | Notes |
|---|---|---|
SITE_HOME |
Primary WAN candidate or backup to fiber/cable | In many rural parcels, satellite broadband is the first stable Internet—treat wireline as prove-it. If both exist, define which is primary and failover in a private runbook. |
SITE_FARM |
Conditional uplink or deferred | Often no trench-grade wireline: Starlink (or LTE) can be primary farm Internet when remote visibility and egress justify hardware + subscription. Defer a second terminal until Phase 1 comms/traffic proof—avoid duplicating “brains” without labor ROI. |
Enables: batched trips with remote checks, VPN paths for admin, cloud/TSDB egress from field gateways, voice/maps when driving.
Must not silently become: a reason to skip physical water/fence checks; assumed bandwidth for camera mesh everywhere; only path for books without offline export; unexamined single-SKU dependency without weather/outage rehearsal.
What changed because of Starlink analysis: WAN is named (Starlink Mini vs Standard spec PDFs in electrical batch source-note) instead of a generic “internet TBD,” so distance-tax and trip batching can be tied to honest uplink expectations.
Distance-tax rules (explicit)¶
Definition — distance tax: The recurring operational penalty of not being co-located with production: round-trip drive time, vehicle OPEX, loaded labor while driving, context switching, inability to do “five-minute checks”, and morale cost when trips are frequent but low value.
Symbols (placeholders—fill with evidence; do not invent local dollars here)
| Symbol | Meaning |
|---|---|
COMMUTE_ONE_WAY |
Minutes one way; planning default ~35 until superseded by P90 from a season of logged drives |
T_RT |
Round-trip drive time = 2 × COMMUTE_ONE_WAY (minutes) |
τ_ctx |
Non-driving friction per visit (gear, fuel, boots, mental handoff)—minutes, measured |
H_VISIT |
Productive on-site hours planned for a visit (work-order scope) |
mi_rt |
Round-trip miles (odometer or maps worst-case) |
$/mi |
Vehicle marginal cost per mile (your books) |
σ |
Loaded hourly cost of operator time including drive (replacement wage or opportunity rate—policy) |
trips_wk |
Expected count of SITE_HOME → SITE_FARM → SITE_HOME cycles in a normal week for an enterprise |
Core formulas (cash + time sanity)
| ID | Formula / rule |
|---|---|
| DT-0 | Forbidden optimism: Do not plan using COMMUTE_ONE_WAY below your logged P90 without a full season of drive logs and a documented reason (road change, move—rare). |
| DT-1 | Minimum visit payload: Let H_block = (T_RT + τ_ctx)/60 + H_VISIT. A “trip” must carry H_VISIT ≥ H_VISIT_MIN unless Tier-1 emergency (see trip policy). H_VISIT_MIN is a family policy placeholder—set it high enough that junk trips hurt. |
| DT-2 | Incremental split OPEX (for worksheet linkage): per Enterprise unit economics, Δ_OPEX_SPLIT_X captures trips, miles, time, cold chain, duplicate gear—not double-counted with haul rows (SPLIT-2). |
| DT-3 | Split burden ratio: R_SPLIT_X = Δ_OPEX_SPLIT_X / max(contribution margin_X, ε) — enterprise X fails SPLIT-1 if R_SPLIT_X > R_SPLIT_MAX (placeholder ceiling). |
| DT-4 | Trip frequency cap (normal ops): If a business model requires trips_wk > TRIPS_WK_MAX and no resident operator at SITE_FARM and no hired daily presence, classify as disqualified or redesign (telemetry, batching, enterprise change). TRIPS_WK_MAX is not generous—treat frequent driving as structural failure. |
Morale and attention tax (non-cash, real)
| ID | Rule |
|---|---|
| DT-5 | Junk trips (drive out for “peace of mind” with no prior work order and no open Tier-1 condition) count toward burnout and invalidate “low labor” claims in family review. |
| DT-6 | Batching is not optional where physical work can be stacked: spread visits across the week without telemetry-backed reason → policy failure, not “being diligent.” |
Distance-tax tiers (for ranking enterprises)
| Tier | Touch expectation | Structural fit with ~35 min split |
|---|---|---|
| T0 — Episodic | Long intervals; surge weeks predictable | Fits if batched + telemetry |
| T1 — Weekly batch | 1–3 non-emergency visit blocks / week | Default target band for family ops |
| T2 — Multi-touch | >3 planned weekly visits or unpredictable extras | High tax—must show R_SPLIT acceptable |
| T3 — Daily physical | Needs eyes/hands most days | Poor fit without resident labor or crew—not baseline |
Distance and batching (metrics table)¶
| Metric | Placeholder | How to update |
|---|---|---|
| One-way commute | COMMUTE_ONE_WAY = ___ min |
Log AM/PM; use P90 for planning |
| Typical productive visit | ___ h on site | Time study |
| Tier-1 alert conditions | Listed in Instrumentation priority matrix + trip policy |
Keep short—alert fatigue = failure |
Batch rules (strict)
- Rule A: No
SITE_FARMvisit for trivial on-site work underH_VISIT_MINunless Tier-1 open or scheduled surge block. - Rule B: Fixed days of week for heavy
SITE_FARMwork; surge weeks override the template explicitly on the calendar. - Rule C: Telemetry that only duplicates what a two-minute walk would fix without reducing trips is not “automation success”—it’s dashboard theater (see
Instrumentation ROI).
Infrastructure split (living document)¶
| Asset | SITE_HOME |
SITE_FARM |
Notes |
|---|---|---|---|
| Internet / VPN termination | Primary | LTE fallback? Y/N | |
| MQTT broker / observability core | Primary | Edge buffer only if designed | Runbook — broker or backhaul down |
| Backup power | UPS / small generator plan | Pump/generator at critical loads | |
| Trailer / load-out | Secondary | Primary |
Known facts¶
| ID | Statement |
|---|---|
| K1 | The 5-acre parcel is not the primary production site in this plan. |
| K2 | The 120-acre parcel is the main production and revenue locus. |
| K3 | Business intent is profit-first, then low labor, then resilience (Planning framework). |
Assumptions¶
| ID | Statement |
|---|---|
| A1 | COMMUTE_ONE_WAY is representative for batch planning until a drive log proves otherwise. |
| A2 | At least one adult can reach SITE_FARM within acceptable emergency delay for the chosen enterprises (define “acceptable” in the coverage matrix). |
Open questions¶
| ID | Question |
|---|---|
| Q1 | Is overnight stay at or near SITE_FARM allowed for calving, hay windows, or security? |
| Q2 | Seasonal road constraints (snow, mud, gate icing) on the route? |
| Q3 | Exact boundary and easement facts—deed vs mental map? |
Iterative updates (over time)¶
- Replace placeholders with logged commute and visit durations (P90, not best day).
- Revisit distance-tax tiers after every enterprise change—R_SPLIT must be recomputed.
- If junk trips persist, treat as operating model failure, not a willpower problem: redesign telemetry, batch policy, or enterprise mix (
disqualifiers).
Related pages¶
East Tennessee two-site farm business plan — two-site operating model— package narrativeTrip batching and site visit policyTwo-site structure disqualifiersEnterprise options analysisDual-site operations model — non-agritourism farm businessField telemetry reference architecture — homestead + 120-acre farmManual fallback and degraded modes — critical operationsEast Tennessee two-site farm business plan — planning framework